Marmaraereglisi Organized Industrial Zone

Marmaraereglisi Organized Industrial Zone

Industry
Font Type
  • Very Small Small Medium Large Very Large
  • Default Helvetica Segoe Georgia Times

Marmaraereglisi Organized Industrial Zone gained legal personality as a Rehabilitated Organized Industrial Zone with registration number 350, upon the approval of the Ministry of Industry and Technology of the Republic of Turkiye dated 06.02.2020 and numbered 1351017.

The Organized Industrial Zone (OSB) gained legal personality by fulfilling the land reclamation requirements, as per the letter dated 19.03.2020 and numbered 37419779-453.01/59 from the Ministry of Industry and Technology of the Republic of Turkey. With the Ministry's decision dated 15.09.2022 and numbered 4024629, the site selection study was completed, and the area, covering 95.75 hectares, consists of a total of 25 parcels; comprising 12 industrial areas, 1 educational area, 1 administrative and social facility area, 7 service and support areas, 2 sports areas, 1 technical infrastructure area, and 1 wastewater treatment plant area.

Strategically located on the Seymen Road between Marmaraereglisi and Corlu, within the Eksielma and Sultankoy neighborhoods, the Organized Industrial Zone is 45 minutes from central Istanbul, 2 hours from the Ipsala border crossing, and 2 hours and 30 minutes from the Kapikule border crossing, placing it adjacent to both Europe and Istanbul.

In addition, it is 40 minutes from Asyaport Port in Tekirdag City Center, 10 minutes from Martas Port in Marmaraereglisi, 10 minutes from Botas Marmaraereglisi LNG processing facility, and 30 minutes from Corlu Airport.

The main sectors of the companies actively producing in the region are: Processed Marble, Kitchenware Manufacturing, Iron and Steel Production, Transportation and Storage, Construction and Contracting, Yarn and Fiber Production, and Coal Screening and Packaging Manufacturing.

Based on the Marmaraereglisi Organized Industrial Zone Development Plans, the 1/1000 scale Development Implementation Plan, the 1/5000 scale Master Development Plan, and the implementation of Article 18 of the Zoning Law No. 3194 have been completed.

References:   Presidency of Marmaraereglisi Organized Industrial Zone
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Essential Cookies
These are cookies necessary for the functionality of the site. They do not contain personalized data. If you reject them, the site's functionality will be limited.
Font Type
Stores the user's preferences for font styles.
Accept
Decline
Font Size
Stores the user's preferences for font sizes.
Accept
Decline
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Shopify.com
Accept
Decline
Google Analytics
Accept
Decline
Marketing
Set of techniques which have for object the commercial strategy and in particular the market study.
Facebook
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save